How much deposit should a tradesman ask for?
There's no single right deposit for every job. Here's how to work out a fair amount, put it on the quote clearly and get paid before you spend your own money on parts.
On this page
There's no fixed answer to how much deposit should a tradesman ask for. The fair amount depends on what you have to buy up front, how far ahead the job is booked and how well you know the customer. Work from those, and you'll never fund a job out of your own pocket.
Why ask for a deposit at all
A deposit does a few jobs at once. It covers what you spend before the work starts. It shows the customer is serious. And it locks a date in your diary that you might otherwise have given to someone else.
Without one, you carry all the risk. You buy the boiler, the tiles or the kitchen units on your own card. If the customer changes their mind or goes quiet, you're left holding stock you may not be able to return.
Most customers expect to pay something up front on a bigger job. Asking for it isn't rude. It's normal business, and it tells people you run things properly.
When a deposit makes sense
You don't need a deposit for every call-out. A quick repair where you carry the parts in the van is usually paid on the day.
A deposit makes more sense when:
- You have to order materials before you start.
- The parts are made to measure or hard to return.
- The job is booked weeks ahead and blocks out your diary.
- The job runs over several days or more.
- You've not worked for this customer before.
The more you'd lose if the job fell through, the stronger the case for asking.
How to set the amount
Start with your own costs, not a number someone told you at the merchants. The aim is to make sure you're never out of pocket before the customer has paid anything.
Base it on materials
The simplest method is to ask for enough to cover the materials you need to buy up front. Customers find this easy to understand. You're not asking them to pay for work you haven't done. You're asking them to pay for the things you're buying for their job.
If the materials include anything made to order, put that in the deposit too. Bespoke items are the ones you can't send back.
Think about the risk
Some jobs carry more risk than others. A new customer, a large job or a long wait before the start date all justify a bigger deposit. A regular customer who has always paid on time might get a smaller one, or none at all.
You don't have to use the same amount every time. Being consistent in how you work it out matters more than using the same figure.
Split longer jobs into stages
On a big job, one deposit and one final bill can leave a long gap with no money coming in. Staged payments fix that.
Agree the stages before you start. Tie each payment to something both sides can see, such as first fix done, plastering finished or units fitted. That way nobody argues about whether a stage is complete.
Staged payments keep your cash flowing. They also mean a smaller deposit at the start, which some customers find easier to agree to.
Don't ask for so much it puts people off
A deposit that looks far bigger than the materials can make a customer nervous. If you need a large amount up front, explain why. People are more relaxed when they can see what the money is for.
What to write on the quote
The quote is where the deposit becomes clear to both of you. Don't leave it for a chat on the doorstep. Write it down. If you want a full run-through of the rest of the quote, see our guide on how to quote a job.
Your quote should show:
- The full price for the job.
- The deposit amount, as a clear money figure rather than a vague phrase.
- What the deposit covers, such as materials or booking the date.
- When it needs to be paid.
- That the deposit comes off the final bill.
- How the customer can pay it.
- Any staged payments and what triggers each one.
- When the balance is due.
Keep the wording plain. "Deposit to cover materials, due before we order parts" is clearer than a paragraph of small print.
Make it easy for the customer to say yes in writing. A reply by text or email is better than a nod on the phone. If there's ever a question later, you'll have it in black and white.
How to bring it up with the customer
Plenty of tradespeople feel awkward asking for money before they start. The trick is to make it part of the process, not a special request.
Mention the deposit when you talk through the quote. Say it simply: "I'll need a deposit to order the materials, then the rest when the job's done." Said calmly, most people just accept it.
If a customer pushes back, explain what the money is for. Point to the parts list. Offer staged payments if the job is big. If someone flatly refuses to pay anything on a job where you'd be buying a lot up front, think hard about whether you want it.
How to take it by card before you order parts
The best time to take the deposit is as soon as the customer accepts the quote. That's when they're keenest. Wait a few days and the job can slip down their list.
Card payments make this quicker for everyone. The customer doesn't need to find your bank details or type in a sort code. They tap a link and pay.
There are a couple of common ways to do it:
- Payment link. Send a link by text or email with the quote or straight after. The customer pays on their phone, whenever suits them.
- Card reader. If you're quoting in person, take the deposit there and then before you leave.
A payment link sent with the quote is often the smoothest. The customer reads the price, agrees and pays in one go.
Whichever you use, follow one simple rule: don't order parts until the deposit has landed. It's tempting to crack on to keep the customer happy. But ordering first puts you back where you started, spending your own money and hoping.
Once the deposit is in, send a short confirmation. Thank the customer, confirm the start date and say what happens next. It's a small thing, but it builds trust.
If you'd rather do all of this from one app, TradiesMate lets you quote and get paid from your phone. Check what each plan includes to see which suits you.
If the job changes
Jobs grow once the floor's up. If the customer asks for more, or you find something you didn't price for, agree the extra in writing before you do it. Say what it costs and whether it's paid now or added to the balance.
That keeps the deposit and the final bill matching what was agreed. Our free sheet to record extra work gives you a simple way to note it on the job.
Keep a record
Log every deposit against the job. Note the amount, the date it was paid and how it was paid. When you send the final invoice, show the deposit clearly as already paid, with the balance underneath.
Good records save arguments. They also make your own books much easier at the end of the year.
Questions
Is there a standard deposit amount for tradespeople?
No. It depends on the job. Cover what you must buy before you start, then adjust for the size of the job, the wait before the start date and whether the customer is new to you.
Should I ask for a deposit on small jobs?
Usually not. If you carry the parts in the van and finish on the day, take payment when the job's done. Save deposits for work where you'd be out of pocket if it fell through.
When should the deposit be paid?
As soon as the customer accepts the quote, and before you order any parts. Put the due date on the quote so it's clear.
Does the deposit come off the final bill?
It should, and your quote should say so. On the final invoice, show the deposit as paid and the balance still owed.
What if the customer won't pay a deposit?
Talk them through the parts list and, on bigger jobs, offer to split the money into stages. If they still won't pay anything where you'd be buying materials first, it may be a job worth walking away from.
What's the easiest way to take a deposit?
A card payment link sent with the quote is quick for both sides. The customer can pay on their phone straight away, and you can see when it's arrived.
Last checked 20 November 2026.
This page is general information, not legal, tax, financial or safety advice. We check our pages, but rules and products change and mistakes can slip through, so check anything important with a qualified professional or the official guidance before you act.